Shorty the Flip House: Week 8

I hope you enjoy these weekly updates as I navigate through the business of flipping houses one house at a time!!  Come back every Friday to see how this house, aka Shorty, progresses from week to week.  To catch up on the progress on Shorty, check out his previous posts here.  If you’re new here, (Hello!!!) you can find more about my 5 previous flip houses here.  Thanks for coming along for the ride!!  

I'll start out today by saying that this week wasn't quite the progress leaps and bounds I was hoping for, but still some very important progress was made.  Most notable change?  Half of the house is all drywalled and patched!

 

In the areas that they haven't patched just yet, they did remove any of the loose/damaged plaster.

While this doesn't look like a huge step in the house, it totally is- drywalling means that painting is coming VERY soon!!  Once we can pull out the paint brushes, things are going to start to look pretty polished pretty quickly.

 

I was really hoping to see the kitchen tile go down this week, but due to scheduling conflicts (my contractor's tile guy was in the midst of tiling 2 bathrooms) I won't get to see tile on the floor until early next week.  BUT that doesn't mean that no kitchen progress happened!  If you caught my insta-story yesterday, you know cabinets got delivered!!!

 

Additionally, I ordered light fixtures for about 90% of the house.  They've already started delivering them and I'm excited to see them installed!!  After paint!

Disclaimer: sources below may contain affiliate links.  Shopping through these links will be at no additional cost to you, however will help keep Copper Dot Baby in cute clothes and support my design addiction so I can keep blogging about it.

Light fixture sources: 1 // 2 // 3 // 4 // 5 // 6

 

Slated for next week is kitchen floor tile, more plastering, and picking paint colors!!!

 

Have a fantastic weekend!!!

Save

Shorty the Flip House: Week 7

I hope you enjoy these weekly updates as I navigate through the business of flipping houses one house at a time!!  Come back every Friday to see how this house, aka Shorty, progresses from week to week.  To catch up on the progress on Shorty, check out his previous posts here.  If you’re new here, (Hello!!!) you can find more about my 5 previous flip houses here.  Thanks for coming along for the ride!!  

This week was filled with build-up and anticipation for next week.  Next week, the first floor drywall is ALL getting patched (meaning paint soon!!!), hopefully the kitchen floor will go down, and cabinets are scheduled to be delivered!  This will be the changing point for the entire house to go from demo zone to finish work.  Well, now that you know that next week will be a big week, this week was a little quiet.

Actually, the entire house is a bit quieter now that a new furnace is installed!  As I mentioned last week, we were having furnace issues and it turns out the only way to really fix it was to replace.  The old furnace was 120k BTUs and the house needed a MAX of 80k BTUs.  Basically the old furnace was jerry-rigged to be installed in the house, but because it would fire up at full capacity and the ducts weren't sized appropriately for such a furnace, it repeatedly had issues.  Heat is kind of a necessity for flipping & repairs- not only do I not want to freeze out my contractors, but things like grout and paint, for example, cannot cure properly below a certain temp.

The new furnace is high efficient and whisper quiet- especially compared to the last.  Additionally, a new furnace allowed us to install central air/AC at a price we couldn't say no to!  The furnace fix has officially busted our projected project budget, but we're optimistic that this will be a selling feature and help us to garner a top price in a hot market this spring!  (she says as she crosses her fingers)

 

Aside from the furnace, Hubby and I did a bit of running around and picking things up.  We took a trip to IKEA and our marriage survived!!  We picked up the powder room vanity and mirror, and the kitchen farm sink, and then headed to the tile store to pick  up ALL the floor tile for the kitchen and powder room.

So happy I was able to find a 6x24 tile at a reasonable price!  My kitchen herringbone dreams will soon be a reality.

I'm so ready to get covered in paint!  With this flip, there hasn't been much for me to work on just yet.  Once the drywall is all repaired, though, we can get to picking colors, painting, repairing trim, installing light fixtures, and generally all the little finish work that makes everything feel clean and new.  A lot is going to fall into place in the next 2 months until we list!

Have an awesome weekend!

Save

Shorty the Flip House: Week 6

I hope you enjoy these weekly updates as I navigate through the business of flipping houses one house at a time!!  Come back every Friday to see how this house, aka Shorty, progresses from week to week.  To catch up on the progress on Shorty, check out his previous posts here.  If you’re new here, (Hello!!!) you can find more about my 5 previous flip houses here.  Thanks for coming along for the ride!!  

Progress happened in the same areas as last week, but things are looking more polished!  I'm itching to get drywall patched so that we can start the marathon of painting the whole house!!

The new wider opening between the kitchen and living room got framed out and makes both spaces feel larger.  I'm not always a fan of full-on open concept spaces, especially in old houses where it just was never meant to be, so widening the connection between 2 rooms achieves the same effect but still fits with the era of home.  When finished, this opening will be trimmed with original & original to match oak trim and look like it was always meant to be.

 

The kitchen and powder room both got some drywall clean-up and new backer-board floors.  They're just waiting for their herringbone tile now!

 

Upstairs, but bathroom is all tiled and grouted - with the exception of right around the window which will be finished once the trim is in.

 

I'm minorly obsessed with this floor.  I want to put it EVERYWHERE!

 

Now I just need to figure out  a color!  I need to get more than a few color sample pots to find the right moody blue for above the tile.  I don't want a color to look black, but I want it very deep, so I'll need to look at paint samples on multiple walls at multiple times of the day to narrow it down.

 

The highs and lows of flipping presented themselves this week.  High: cabinets will be here in 2 weeks!  A full month earlier than I anticipated!!  Low: discovering that we probably need a new furnace and hot water heater *sad trombone*.  We're getting another opinion today, but that's flipping for you!  Just when you think you've uncovered all the potential major issues, the house disagrees.  Luckily, I've seen a lot with flipping at this point, so big things like this don't phase me as much as they used to.  This house will still be AWESOME when I'm done with it!

 

Bathroom sources so far (since everyone keeps asking about the swoonworthy floor tile):

Disclaimer: sources below may contain affiliate links.  Shopping through these links will be at no additional cost to you, however will help keep Copper Dot Baby in cute clothes and support my design addiction so I can keep blogging about it.

Floor:  Karra Hexagon Porcelain Feild Tile with Sterling Silver grout.  Wall: American Olean Ice White Subway tile with Light Pewter grout

 

Have a great weekend!!

 